Listing 015 – Shenandoah Valley, VA

Data Center Site Available in the Shenandoah Valley Region of Virginia

Originally built in the early 1980’s, this one-story, 102,000 square foot building was upgraded in 2010, including the construction of 33,000 square feet of fully conditioned raised floor. The space, coupled with the approximately 10,000 square feet of condition space (leased), provides a high density N+1 configuration with the ability to deliver additional power as well as offer a 2N configuration.

Data Center services are currently being provided in approximately 10,000 square feet of the conditioned space. The remaining 23,000 square feet of conditioned space is vacant and ready for deployment. There is an additional 15,000 square feet of shell space available for immediate construction. The site can be expanded by as much as 40,000 square feet of one-story space. The on-site substation can be upgraded to power the additional space.

General Facility Highlights:

  • Tier III Redundancy – Uptime Certified For Design And Operation
  • Leed Silver Certified – Expected Power Usage Effectiveness (Pue Under 1.36)
  • Closed Loop Water Cooled Chiller System With Blow Down Water Used For Irrigation
  • 25 Mw Electrical Sub Station On Property (Expandable To 33Mw)
  • Existing Data Center Sq Ft 10,000 With Full Supporting Infrastructure, (20) Crah Units And UPS’s – Space Currently Under Lease
  • 10,000 Sq Ft Basement Under Existing 10,000 Sq Ft Data Center With Infrastructure For The 10,000Sq Ft Plus Vesda System
  • 2010 Built 33,000 Sq Ft Raised Floor Data Center (40” Raised Floor)
  • 33,000 Sq Ft Built In Three Separate Sections Each With Independent Infrastructure (13’ Ceilings Above Raised Floor)

100,000 Sq Ft Facility – Sq Ft Usage Breakdown:

  • (2010) 33,000 Sq Ft Raised Floor Data Center
  • 150 Watts Per Sq Ft Expandable To 335 Watts Per Sq Ft
  • 10,000 Raised Floor Data Center Under Lease
  • (2010) 5200 Sq Ft NOC
  • (2010) 8000 Sq Ft Finished Office Space, Reception, Guard Station, Washrooms, 2 Café, 21 Offices, Open Space, Hallway
  • 2000 Sq Ft Shipping/ Receiving
  • (2010) 11,000 Sq Ft Electrical Equipment Room, UPS And Battery Cabinets, Switch Gear, Hallway, 15,000 Sq Ft Unfinished Space
  • (2010) 2700 Sq Ft Storage / Work Room Built Out
  • 2000 Sq Ft Separate Redundant Demarc Rooms, Opposite Ends Of Building 1000 Sq Ft Each
  • (2010) 9000 Sq Ft Approx. Misc Common Or Other Space

Facility Supporting Infrastructure:

QUANTITY EQUIPMENT
5 (2010) 450 ton McQuay Water cooled chiller plants each with water storage tank
48 (2010) Down flow CRAH unit – STUZ
8 (2010) Upflow CRAH units – STUZ
10 (2010) 750KVA/682IKW UPS systems – powerware
40 (2010) 225KVA PDU’s – Liebert
1 (2010) VESDA fire suppression system covers each section of the data center
9 1.5 MW caterpillar Gensets, all generators have a fuel day tan (3- added 2010) each day tank is 6,000 gallons
2 Fuel storage tanks, each tank is 20,000 gallons above ground
(2010) Advanced fuel monitoring system
(2010) Irrigation system with chiller reclaimed with an under ground water 10,000 gallon storage tank
(2020) fuel filling containment system with leak detection and Oil/water separation system

Security:

  • 8 Foot Perimeter Fencing Surrounds Property
  • Two Entrance’s With Security Gate, Intercom With Cameras And Card Access
  • Camera’s Outside And Inside Covering All Areas
  • Inside Guard Station In The Main Building Entrance
  • 24/7 Security Guards
  • Infrastructure Alarms Monitored 24/7 In The Guard Station Thru Visual Alarm Panels And With Mobile Phones
  • Security Card Access At All Interior And Exterior Doors Thru Out The Facility – Guard Monitored 24/7

Fire Suppression:

  • Building is covered by a double interlock pre-action system
  • Data rooms have a primary Inergen gas suppression that is also backed by the pre-action

Chilled Water:

  • Closed Loop has roughly 45,000 gallons and will flow 6,000 GPM under full load
  • CWS & CWR pipe sizes header is 18” plus insulation and heat trace
  • Loops in the building are 12” plus insulation

Roof:

  • Carlisle golden seal total roofing system
  • 60 MIL EPDM membrane, mechanically fastened with 20 year warranty
  • Installed 2008

Fiber Information:

  • Ntelos, Shentel, Level 3, and Verizon
  • Dual Entries

btn_contact

PTS Data Center Solutions, Inc.
Experts for Your Always Available Data Center

16 Thornton Road, Oakland, NJ 07436
Phone: (201) 337-3833
FAX: (201) 337-4722
real-estate-015-floor-plan real-estate-015-aerial

 

State: VA, Virginia

Data Center Property Type: Existing